BESS · Storage

BESS Fundão Fase II

Battery energy storage system linked to Fundão Phase II. Foundation staking and control.

Type
BESS · Storage
Capacity
40.2 MW · 80.49 MWh
Country
Portugal
Year
2026
BESS Fundão Fase II plant in Portugal

The Fundão Phase II BESS called for high accuracy on the battery container foundations. Our crew staked and checked every foundation with a total station before the concrete pour, then documented the as-built result.

Scope of our work

  • Container foundation staking.
  • Formwork geometric control.
  • As-built survey.