Solar PVFundão Fase II
- Capacity
- 22 MWp
- Country
- Portugal
- Year
- 2025
BESS · Storage
Battery energy storage system linked to Fundão Phase II. Foundation staking and control.

The Fundão Phase II BESS called for high accuracy on the battery container foundations. Our crew staked and checked every foundation with a total station before the concrete pour, then documented the as-built result.